Steel structure engineering construction service process description
Ⅰ. Preliminary communication and demand confirmation
1. **Preliminary contact**
- Customer submits project information (purpose, scale, construction period, etc.)
- We respond within 24 hours and arrange for the technical team to conduct on-site inspection or video inspection.
2. **Requirement lock**
- The meeting between the two parties clarified: load requirements, appearance effects, budget range
- Output "Project Requirements Confirmation" (including signed version by both parties)
Ⅱ. Scheme design and quotation
1. **Free scheme design**
- Provide design scheme within 5 working days (including floor plan + elevation + section)
- The scheme clarifies: structure type, steel consumption estimation, foundation requirements
2. **Accurate quotation**
- Provide detailed quotation after signing the confidentiality agreement
- Includes: material brand (Baosteel/Ansteel, etc.), construction technology, tax details
Ⅲ. Contract signing and preparation
1. **Contract signing**
- Use the sample text of the Ministry of Housing and Urban-Rural Development, and focus on:
✓ Construction period guarantee (rainy and snowy day extension clause)
✓ Payment node (materials and construction are paid in stages)
✓ Quality commitment (50-year life of the main structure)
2. **Preparation for construction**
- Customer cooperation: site three connections and one leveling, construction permit application
- Our preparation: steel structure production, material delivery, construction drawings submission
Ⅳ. Transparent management of the construction phase
1. **Foundation construction (20-50 days depending on the size of the project)**
- Pre-embedded anchor bolts (laser positioning, error ≤2mm)
- Live broadcast: concrete pouring process
2. **Steel structure installation (core stage)**
- Daily progress report: WeChat group sends hoisting photos/videos
- Invite customers to witness key nodes:
✓ First steel column hoisting ✓ Main body closure ✓ Fire retardant coating completion
3. **Double quality insurance**
- Self-inspection: 100% inspection of each process team
- Third-party inspection: weld flaw detection report, fire retardant coating inspection
Ⅴ. Acceptance delivery and after-sales
1. **Completion acceptance**
- Three-party acceptance (customer/supervisor/construction party)
- Delivery package: completion drawings + inspection report + warranty
2. **Free maintenance service**
- During the 1-year warranty period: 72 hours on-site service for structural problems
- Lifetime technical support: Provide annual safety inspection recommendations
Flowchart:
Customer consultation → On-site/video survey → Project quotation → Contract signing → Factory prefabrication → On-site construction → Acceptance and delivery → Lifetime maintenance